The points you'll regret not planning before interiors begin

August 2026 10 min read By Wood & Co. Interiors

No plug beside the bed. A chimney point at the wrong height. A washing machine tap on the opposite wall from its socket. Here's the room-by-room checklist to lock in before conduits get chased into your walls.

If you've ever lived in a home and wondered why there's no switch within reach of the bed, or why the router has to sit on the floor because there's no point near the TV unit, you've felt the cost of this exact gap. Most electrical and plumbing points get placed by a civil contractor working off standard practice, not your actual furniture layout, because at that stage nobody's thought about where the sofa or the bed will go yet.

If you're building your own home, this is entirely avoidable, but only if it's decided at the right moment. Once plastering starts, every point is locked in. Anything missed after that means cutting into a finished wall to fix it.

Free Interior Cost Calculator

Planning your interiors already?

See a real estimate for your home in about a minute.

Calculate my estimate

Why this can't wait until interiors start

Electrical conduits are chased into walls or cast into the slab, and plumbing lines are laid, before plastering happens. That's a civil-stage decision, not an interior-stage one. By the time an interior team walks in to install a modular kitchen or wardrobes, the wall is already finished. If a point is missing at that point, the only options are surface-mounted conduit, which looks exactly like what it is, or cutting into the plastered and painted wall to add it properly.

This is also exactly the gap that causes the most regret in Indian homes: the civil contractor and the interior designer are usually two separate people who never actually spoke to each other during the point-marking stage.

The room-by-room checklist

This is the list we walk through with every client before plastering starts, because we handle both the civil build and the interior fit-out ourselves, there's no gap for these details to fall into.

Living Room
PointCommon miss
TV unit power + cablePlaced at floor level only, visible wires once the unit and wall panel go up
Side/floor lamp pointsNo point near actual seating position, only near the main switchboard
WiFi router pointMissing entirely, router ends up on the floor behind the TV unit
AC point + drain provisionDrain line not planned, condensate pipe left running down an outside wall
Curtain track / pelmet provisionCeiling not reinforced where a heavy curtain track will be fixed
Kitchen
PointCommon miss
Chimney pointHeight fixed before the chimney model and hob width are actually chosen
Appliance points along counterSpaced as a generic row, not matched to where the mixer, toaster, and kettle will actually sit
Water purifier pointMissing, added later as a surface-mounted line across the wall
Refrigerator pointPlaced too close to the hob, or with no clearance for the fridge door swing
Dishwasher provisionSkipped even when it's planned "for later," making a future retrofit far harder
Bedrooms
PointCommon miss
Bedside points, both sidesOnly one side gets a point, usually not the side you end up sleeping on
Reading light switchMain switch is by the door, not reachable from the bed itself
Wardrobe interior lightNo point left inside a walk-in or loft wardrobe cavity
USB charging pointsLeft out entirely, solved later with a bulky adapter block
Bathroom & Utility
PointCommon miss
Geyser pointWired for a smaller geyser than what's eventually purchased
Washing machine pointPlumbing inlet in one corner, electrical socket in a completely different one
Exhaust fan pointPositioned without checking the final false ceiling layout
Mirror/vanity lightCentered on the wall instead of the actual mirror position
Outdoor weatherproof socketMissing on the utility balcony, needed for an outdoor washing machine or dryer

How to actually get this right

The fix isn't complicated, it just requires the two sides to talk to each other before the point of no return.

This is the one coordination step that's genuinely hard to pull off when your civil contractor and interior team are two unrelated companies working on their own timelines. It's also exactly why we handle both under one roof, there's no handoff for these details to fall through.

Frequently asked questions

Why can't electrical and plumbing points be added after interior work starts?

Conduits and pipes are chased into walls or cast into the slab before plastering. Adding a point afterward means cutting into a finished, painted wall and patching it, more expensive and never quite as clean as the original.

Who decides where electrical points go, the civil contractor or the interior designer?

Ideally both, together. A contractor places points based on standard practice, not your furniture layout. Without coordination, points end up not matching where things actually go.

When exactly should I finalize these points?

Before plastering begins. Walk the site with your furniture layout in hand and mark every point with your electrician and plumber before conduits are chased in.

General guidance for planning purposes. Exact point placement should always be confirmed on-site against your specific furniture and appliance layout.